Thursday, November 18, 2010

Parking lot, sidewalks, stucco and more!


Work is continuing, even when it rains! In some of these pictures, you will notice tarps draped across the front of the building. It has been raining and the workers are trying to get the stucco applied to the outside of the walls. Parking lot in the back is progressing nicely, even though it is hard to see in these pictures. So far, two sections of it has been poured. Sidewalks and curb work has been done as well. There have been things going on inside the building. It sounds like it is painted, and cabinets will be installed soon. While we cant see inside yet, we know work is continuing on. By the sounds of things, January 2011 will be the dedication to the building, and the open house will take place in the Spring, April?

Wednesday, November 3, 2010

Bricks!

The bricks are climbing their way up the front of the chapel! It is looking absolutely beautiful! The warmer days of autumn are nearly over so we are looking forward to seeing this getting completed!

Monday, November 1, 2010

LoNg TiMe...







Been a while since the last post. There are still a lot of things progressing at the new Church building! MOST of it is on the inside. Retaining walls are coming up around the East and West sides of the buildings, and brick is being placed along the lower sections of the outside of the building and shed! The under ground work "seems" to be completed and it looks like the area set for the parking lot has been worked on as far as leveling it out. I know that on the inside, sheet rock is in place, and textured, ready for the paint! Besides all of that, I don't know of many details that are happening. It drives some of us crazy that we cant see the inside yet! :P