Work is continuing, even when it rains! In some of these pictures, you will notice tarps draped across the front of the building. It has been raining and the workers are trying to get the stucco applied to the outside of the walls. Parking lot in the back is progressing nicely, even though it is hard to see in these pictures. So far, two sections of it has been poured. Sidewalks and curb work has been done as well. There have been things going on inside the building. It sounds like it is painted, and cabinets will be installed soon. While we cant see inside yet, we know work is continuing on. By the sounds of things, January 2011 will be the dedication to the building, and the open house will take place in the Spring, April?